Fuel Depot Installation – Diesel Aboveground Storage Tanks (AST) 23m3
Our experienced civil and mechanical team completed the project from start to finish.
Civil work included the construction of a double-walled bund wall, pump island, and filling island including spill slabs.
Tank installation included 3 x 23 000L above-ground tanks and two NSO3 oil separators for the removal of water and control spills preventing discharge of free oil to municipal sewer or direct discharge outfalls.
The mechanical team manufactured all the pipes, vent pipes, stairs, and walkways to the oil company’s specifications.
We designed and installed a pipework system for tank’s suction, pressure, and pipework to ensure the highest standards in accordance with our quality and safety system.
Ensuring all lines are pressure tested and up to oil company standards.
The installation included a Smith meter configuration for the filling up of trucks.
The weather was favourable and we have one happy client!
Construction Date: 2020
Location: Mosselbay, South Africa
Category: Construction Management, Fuel Installation, Project Management, Storage Depot, and Terminal Installation
Duration: 6 Months
Scope:
- Construction Management for Fuel Depot Installation
- Manage Quality Assurance and Quality Control (QA/QC)
- HSSE Management
- Project Documentation Management
- Manage Installation of Fuel Management Installation
- Handover Installation to Client
HSSE Management:
- PetroENG was tasked with ensuring that the project was executed in compliance with all HSSE requirements set out by OHS Act and Client specifications.
Construction Management:
- PetroENG was tasked with overseeing, and managing the construction phase of the project and installation of 3 AG 23KL tanks with piping on behalf of the client.